The Sheikh Najjar Industrial City Administration is implementing a comprehensive project to rehabilitate the lower pumping station.

Date 2025-10-01

The Sheikh Najjar Industrial City Administration is implementing a comprehensive project to rehabilitate the lower pumping station, which receives industrial water from Tal Hasil and pumps it to the upper station.
The project includes upgrading the water outlet point on the DN1000 main supply line and installing two new main pumps, along with electrical panels, operating panels, and power factor improvement panels.
The work also includes advanced mechanical equipment, such as two maintenance pumps, shock tanks, non-return valves, a DN1000 main valve, an electromagnetic meter, and an emergency discharge line.
The project aims to enhance water pumping and increase the areas benefiting from industrial water through percolation irrigation.
The project is expected to be completed by mid-November, God willing, while adhering to the highest standards of quality and efficiency.