Industrialists are required to refrain from roofing the side windows (front, side, and rear).

Date 2025-11-20

Industrialists are kindly requested to refrain from roofing the facades (front, side, and rear), and to remove the roofs erected on the facades of some industrial facilities within a maximum period of one month from the date of issuance of this circular.